Skip to content

Sat, 28 Nov 2026 · Agbor edition

28°C · Partly cloudy

HomeLocal NewsMetro

Metro

Breaking

Uromi Junction flyover takes shape as Agbor’s traffic plan advances

The N59.7bn interchange, commissioned for construction earlier this year, is now a daily fact of life at one of Ika land’s most dangerous junctions.

Emeka Nwosu · Infrastructure correspondent

Fri, 2 Oct 2026, 09:15 · Agbor, Ika South · 4 min read

Concrete flyover under construction over a busy Agbor junction
Deck work continues on the Uromi Junction flyover. Photo: AgborNews

AGBOR — Steel and concrete have replaced the old argument at Uromi Junction. The flyover Governor Oborevwori commissioned for construction — a N59.7 billion job meant to untangle Agbor’s worst interchange — is now high enough that traders in the surrounding shops talk about “when the bridge opened” as if it were already a date on the calendar.

Site engineers say pile and pier work is substantially through, and decking is moving in sections so that one arm of the junction can keep a trickle of traffic. The noise is constant. So is the dust. Residents who have lived with accidents at the junction for a generation say they will endure both if the finished bridge does what was promised.

Uromi Junction sits on the old Lagos–Asaba corridor. Tankers, luxury buses and school runs compete with keke and pedestrians who still cross as if the road were a village street. Last year alone, AgborNews logged multiple fatal crashes within a few hundred metres of the roundabout.

Ika South chairman Engr. Jerry Ehiwarior has urged motorists to obey the temporary diversions and to stop filming from the median. Two weeks ago a young man climbed a pier for a phone video and had to be talked down. “The flyover will still be there tomorrow,” a site supervisor told us. “Your neck will not.”

When it opens, the interchange is expected to cut the crawl from Boji-Boji to the Asaba road by several minutes at peak, and to give the palace, the barracks and the hospital a cleaner approach. For now it is a construction site in the middle of a living town — and Agbor is learning to drive around its future.

Related